JOBS AT QATAR ELECTRICITY & WATER AUTHORITY
Early 1900’s to
1940’s: From the early 1900’s to the late 1940’s, no information is available
about the status of the supply of water and electricity in Qatar. Records show
that Qatar’s first Oil Well in Dukhan started production in 1940 and first oil
shipment was exported in 1949. These are indicators that large permanent
communities may have been established around that period needing sustained
water and electricity for survival and industry.
Early 1950’s - Late
1960’s
• The supply of water
and electricity were controlled by the British. They came under two separate
departments, the State Electricity Department and the State Water Department.
Qatar was then a British Protectorate.
• First Desalination
Plant with a capacity of 150,000 imperial gallons per day was built in 1953.
• The first diesel
powered electricity station was built in Mushaireb, stationed where the Le
Mirage Hotel now stands.
• The Ras Abu Aboud
power station began operation in 1963 using steam turbines.
• Ras Abu Aboud
desalination plant began distilling water over the same period.
• Desalinated water
was stored in ground reservoirs and water towers then carted by water tankers
to consumers.
• All users of water
and electricity paid for the service.
Posting Date
|
Job Title
|
Department
|
|
12.02.2018
|
Materials Department
|
||
12.02.2018
|
Materials Department
|
||
16.01.2018
|
Water Operation
& Control Dept
|
||
16.01.2018
|
Water Maint &
Fld Servcs Dept
|
||
06.11.2017
|
Water Operation
& Control Dept
|
||
16.10.2017
|
Water Operation
& Control Dept
|
||
16.10.2017
|
Water Operation
& Control Dept
|
||
10.05.2017
|
Water Operation
& Control Dept
|
||
04.04.2017
|
Electricity System
Control Dep
|
||
03.04.2017
|
ElectricityTransmission
Dept.
|